How to Demo a Concrete Patio: Tear-Out and Concrete Patio Preparation

How To Demo A Concrete Patio
How to demo a concrete patio in San Antonio, then handle concrete patio preparation: 811, tools, steps, tear-out cost, disposal, base work, and timing.
Concrete Guide · San Antonio, TX

Here is how to demo a concrete patio safely, from the 811 call to the last load of rubble, and what concrete patio preparation looks like once the old slab is gone. It covers tools, step-by-step tear-out, disposal, what demolition costs in San Antonio, and how our clay soil changes the base work before a new pour.

Updated October 2026 · Reviewed by Ted, Owner · 9-minute read
Quick Answer

To demo a concrete patio, call 811 two business days before digging, score the slab into sections, break it from an edge, cut the steel, and haul it away. Pro tear-out typically runs $1.50 to $3.00 per square foot. San Antonio clay soil then needs a compacted base. Call a pro near the house or utilities.


Should you demo a concrete patio or resurface it?

Demo the patio when the slab itself has failed: sunken sections, cracks that keep widening, or water that drains toward the house. If the slab is level, drains, and is not moving, an overlay or repair usually costs less than a tear-out.

  • Demo makes sense when: panels have sunk or tilted, roots have lifted large sections, the base has washed out, or you want a new size, shape, or grade.
  • Resurfacing makes sense when: the problem is a faded, worn, or dated surface on a slab that is still sound.

Our overlay vs tear-out guide and repair or replace guide walk through the choice in more detail.

Patio demo and prep at a glance

Break it out, haul it off, build the base right

Call 811
2 business days
Before any digging
Pro tear-out
$1.50 to $3.00
Per sq. ft., with haul-away
New base
4 to 6 inches
Compacted gravel
Estimate
Free, in writing
Before any tear-out

What should you do before you demo a concrete patio?

Call 811 at least two business days before you dig, find your irrigation lines, and clear the patio. Texas law requires the 811 call before excavating, even in your own backyard.

  1. Call 811: Dial 811 or file online. Locators mark gas, water, and power lines within two business days. See our patio permit guide for details.
  2. Find sprinkler lines: Private irrigation lines are not marked by 811. Shut the system off and flag the heads near the slab.
  3. Check the slab edge: Dig a small hole at the edge to see how thick the concrete is and whether it has rebar or wire mesh.
  4. Look where it meets the house: A patio tied into the foundation, a pool deck, or a cover post needs a careful cut line, not a sledgehammer.
  5. Clear the area: Move furniture, grills, and planters, and set up a staging spot for the rubble.
  6. Plan the new slab: If a cover, deck, or wiring is part of the new patio, ask the City first. A patio cover over 300 square feet or attached to the house needs a permit.

What tools do you need to demo a concrete patio?

For a typical 4-inch patio you need a saw to score the slab, a demolition hammer or sledgehammer to break it, cutters for the steel, and a way to move heavy rubble. Thicker or reinforced slabs call for a rented electric breaker.

ToolWhat it does
Circular saw or angle grinder with a diamond bladeScores cut lines and makes a clean edge next to the house or a pool deck
Electric demolition hammer (breaker)Breaks slabs 4 inches and thicker, and reinforced concrete
SledgehammerBreaks thin or already cracked sections
Pry barLifts and splits broken pieces apart
Bolt cutters or a reciprocating saw with a metal bladeCuts wire mesh and rebar
Wheelbarrow and a flat shovelMoves rubble to a trailer or dumpster
Safety gearEye protection, hearing protection, a fitted respirator, leather gloves, and steel-toe boots

How do you demo a concrete patio step by step?

Score the slab into small sections, start breaking at an edge, cut the steel as it shows, break big chunks down, and haul the rubble out. Working from the edge gives the concrete somewhere to break into.

  1. Score a grid: Saw cut lines about an inch deep so pieces come out at a size one person can lift. Mist the blade with water to keep dust down.
  2. Cut the edge next to the house first: A full-depth saw cut where the patio meets the foundation or a pool deck keeps cracks from running into the part you keep.
  3. Break from an edge: Start at a corner or the open edge and work in rows along your cut lines. Let the tool do the work.
  4. Pry and lift: Slide a pry bar under broken pieces to free them from the base.
  5. Cut the steel: Cut mesh with bolt cutters and rebar with a metal blade. Never leave bar ends sticking up.
  6. Break big pieces down: Concrete weighs about 150 pounds per cubic foot, so a 4-inch slab is about 50 pounds per square foot.
  7. Haul and clean up: Load the heaviest pieces first, then rake out loose chunks so the base can be checked.
Stop and call a pro when
  • The patio is tied into the house foundation, a pool deck, or a patio cover
  • 811 marks show a gas or power line near or under the slab
  • The slab is thicker than you expected or heavily reinforced
  • Cracks or settling run into the foundation of the house

Call (713) 504-2341 or request a free quote.


What do you do with the broken concrete?

Broken concrete has to be hauled to a recycler, a landfill that takes it, or a dumpster rented for heavy debris. It does not go in curbside trash, and a regular dumpster can be overloaded fast.

  • Weight adds up: A 200-square-foot patio at 4 inches is about 10,000 pounds of rubble, which is why disposal is often the hardest part of a do-it-yourself demo.
  • Concrete recyclers: Clean concrete is often crushed and reused as base material. Call ahead about steel and dirt.
  • Heavy-debris dumpster: Ask the rental company whether concrete is allowed and what the weight limit is.
  • Reuse on site: Clean pieces can become garden edging or fill where nothing will be built on top.
  • Pro tear-out: Our crews break out the slab and haul it away as part of the job.

How much does it cost to demo a concrete patio in San Antonio?

Professional tear-out and haul-away typically runs about $1.50 to $3.00 per square foot in San Antonio. That is about $300 to $600 for a 200-square-foot patio.

ItemTypical cost in San AntonioSource
Tear-out and haul-awayAbout $1.50 to $3.00 per sq. ft.Replacement cost guide
200 sq. ft. patio tear-outAbout $300 to $600Patio size cost guide
400 sq. ft. patio tear-outAbout $600 to $1,200Arithmetic at $1.50 to $3.00
New broom-finish patioAbout $6 to $12 per sq. ft.Patio installation cost guide
New stamped or colored patioAbout $12 to $25 per sq. ft.Patio size cost guide

Typical estimates as of October 2026, not a quote. Thickness, steel, access, and haul distance move the price, and a site visit sets the real number.


What does concrete patio preparation involve after the demo?

Concrete patio preparation means stripping topsoil and roots, setting the grade, compacting 4 to 6 inches of gravel base, and setting forms so the new slab drains away from the house. Plan on about 8 to 10 inches of total depth for a standard 4-inch patio.

  1. Strip and dig: Remove leftover base, topsoil, and roots down to firm soil.
  2. Set the grade: The finished patio should sit below the door threshold and slope about 1/4 inch per foot away from the house. See how much slope a patio needs.
  3. Build the base: Spread 4 to 6 inches of crushed stone or road base and compact it with a plate compactor, not just a rake.
  4. Set forms: Stake forms to the right height and pitch, and plan control joints.
  5. Place the steel: Set rebar or mesh on supports so it ends up inside the slab, not on the ground. See rebar or wire mesh for a patio.
  6. Pick the thickness: 4 inches for a standard patio, 5 to 6 inches under a hot tub or outdoor kitchen. See how thick a concrete patio should be.

How does San Antonio clay soil change concrete patio preparation?

Much of San Antonio sits on expansive clay that swells when wet and shrinks in drought, so the base matters as much as the concrete. Soft soil comes out, and compacted crushed stone goes in so the new slab does not move with the clay.

  • Find the cause: If the old patio sank or cracked, look at drainage, downspouts, and roots before the new pour, or the same thing happens again.
  • Thicker edges: Many crews thicken the slab edge so it does not crack where the soil dries and pulls away.
  • Drainage first: Water that ponds against the house softens the base. The new grade has to carry it away.
  • Pour timing: In summer heat we pour early in the day so the surface does not dry before finishing.

Should you demo a concrete patio yourself or hire a pro?

A small, thin, unreinforced slab away from the house is a reasonable do-it-yourself job. A large, thick, reinforced, or attached patio is usually faster and safer with a crew that also handles disposal and the new base.

FactorDo it yourselfHire a crew
EquipmentRent a breaker, saw, and trailer or dumpsterCrew brings it
DisposalYou load and haul thousands of poundsHaul-away is part of the tear-out price
TimeOften a full weekend or moreUsually part of day 1 of the job
RiskBack injuries, silica dust, hitting a lineExperienced crew, insured
Base checkEasy to miss soft spotsBase is checked before the new pour

How long does it take to demo and replace a concrete patio?

Most standard patios are torn out, prepped, formed, and poured in about 1 to 3 working days once the site is ready. Concrete keeps gaining strength for about 28 days, so wait before heavy loads.

  • Day 1: Tear-out, excavation, base, and forms.
  • Pour day: Steel set, concrete placed, finished, and jointed.
  • After the pour: Curing, form removal, and sealing if planned.

Rain, a permit question, or extra base work for soft clay can add days. The timeline above comes from our patio size cost guide.


When should you call a pro for patio demolition?

Call a pro when the patio touches the house or pool, when utility marks run near the slab, or when you plan a new patio right after. One crew can break out the old slab, fix the base, and pour the new one.

We look at the slab, the soil, and the drainage, then give you a free written quote for the tear-out and the new patio before any work starts. Request a free quote or call (713) 504-2341. Learn more about our concrete patio service in San Antonio and patio installation.

Ready to replace that old patio?

Free site visit and a written price for tear-out, base prep, and the new pour before any work starts. Insured, with $2,000,000 liability coverage. Father-son owned in San Antonio.


Where do we work?

Affordable Concrete San Antonio works across San Antonio and nearby areas from our shop at 1247 W Thompson Pl, San Antonio, TX 78226.

We tear out and replace patios in San Antonio and these nearby areas: Helotes, Leon Valley, Shavano Park, Terrell Hills, Alamo Heights, Converse, Universal City, Schertz, Boerne, Cibolo, Fair Oaks Ranch, Bulverde, Spring Branch, New Braunfels, Pleasanton, Floresville, Castroville, Lytle, and Von Ormy. Not sure about your address? Call (713) 504-2341.


What else are homeowners asking?

These are the short answers people want before they book a quote.

How do you demo a concrete patio?

Call 811 first, score the slab into small sections, break it from an edge with a demolition hammer or sledgehammer, cut the rebar or mesh, and haul the rubble to a recycler or a heavy-debris dumpster.

Do I need to call 811 before I demo a concrete patio?

Yes, if anyone will dig. Texas law requires a call to 811 at least two business days before excavating, even in your own backyard.

How much does it cost to remove a concrete patio in San Antonio?

Professional tear-out and haul-away typically runs about $1.50 to $3.00 per square foot, or about $300 to $600 for a 200-square-foot patio.

What is involved in concrete patio preparation?

Strip topsoil and roots, set the grade so water drains away from the house, compact 4 to 6 inches of gravel base, set forms, and place steel on supports before the pour.

How much does a 4-inch concrete patio weigh?

Concrete weighs about 150 pounds per cubic foot, so a 4-inch slab is about 50 pounds per square foot. A 200-square-foot patio is about 10,000 pounds of rubble.

Can I pour a new patio over the old one instead?

Only if the old slab is sound, level, and drains well. A sunken, cracked, or poorly drained patio should come out so the base can be fixed first.

Written and reviewed by
Ted
Owner · 40 years of personal experience

Affordable Concrete San Antonio is a father-son concrete company in San Antonio. Ted reviewed this guide against our concrete patio service page and our patio cost, thickness, slope, permit, and overlay guides.

Sources used in this article:

This article is general information for San Antonio homeowners. Demolition is heavy, dusty work; wear safety gear and call 811 before digging. Prices are typical estimates as of October 2026 and are not a quote.